akp wins £1.2m Aberfoyle Primary School refurbishment

akp Scotland has been engaged as principal contractor to carry out the major refurbishment of the gothic style listed Aberfoyle Primary School to create an up-to-date learning environment.

akp wins £1.2m Aberfoyle Primary School refurbishment

Built in 1870, Aberfoyle School, the Kirk and the Schoolmaster’s House was followed by a separate SE block built circa 1890, and the two sections connected by a linking block in 1906.

Aberfoyle Primary School is the work of John Honeyman one of the better-known Scottish architects of the late 19th century. All three phases were designed or overseen by him. Detailing can be seen throughout with the use of shouldered windows and gable-headed bays breaking eaves with tripartite cusped lancet windows. There are also some further 20th century additions.



akp wins £1.2m Aberfoyle Primary School refurbishment

The works to be completed by akp will bring the building into the 21st century whilst being sympathetic to the buildings listed status, with the formation of accessible entrance and extensive internal alterations, a new slate roof, stonework repairs, outbuilding demolition, and extensive decoration outside and in.

Martin McColl, akp managing director, said: “We are delighted to be part of this project, to bring a new lease of life to this quaint building which is indeed a piece of local heritage.



“The team will draw on their considerable expertise of delivering projects in live environments and public areas where the day-to-day needs of the nearby nursery, parent and pupils alike will always be at the forefront of our site activities.”


Share icon
Share this article: