MIXED USE and NON-RESIDENTIAL

Applicant: Blocwork LLP

Planning Authority: Glasgow

Details: Construction of student accommodation and associated landscaping



Location: Site on corner of Teviot Street/ Gilbert Street, Glasgow

Agent: Ryder Architecture, Per David Buchan, 221 West George Street, Glasgow

 

RESIDENTIAL – TEN UNITS OR MORE



Applicant: Merchant Homes Partnerships Ltd and Home Group

Planning Authority: Glasgow

Details: Construction of residential development (24 units) and associated parking and landscaping

Location: Site formerly known as 15 Ashtree Road, Glasgow



Agent: Graeme Nicholls Architects Limited, Per Graeme Nicholls, Flat 403, 90 Great Western Road, Glasgow

 

RESIDENTIAL – FEWER THAN TEN UNITS

Applicant: Mr Ali



Planning Authority: Glasgow

Details: Construction of flatted property (3 units) above existing retail units.

Location: 186 - 192 London Road, Glasgow

Agent: David Hughes, 396A Albert Drive, Glasgow

 

TENDERS

Contract Authority: Falkirk Council

Details: This contract will restore the remnant Dorrator “Swing” Bridge pillar structure and concrete plinths, construct new path access and install a new seating area by the River Carron, Larbert. Any treatment applied to the remnant bridge structure will prevent further corrosion and deterioration for a minimum of 25 years. The project also involves cleaning up and repainting the existing car park vehicle barrier adjacent to the bridge area (Bill of Quantities and Specifications have been uploaded to this site).

Works include:

- Cleaning, preparing and restoring the remaining Swing Bridge pillars

- Repair concrete plinths on north and south of the River

- Cleaning, preparing, restoring and reattaching bridge cable to existing pillars on south bank of river. The contractor will also need to design and install a new ground anchor point

- Supply and install a steel interpretative bench

- Install new sections of 2m wide bitmac paths linking existing path network to seating area and bitmac surfacing for seating area

- Clean, prepare and repaint existing car park area vehicle barrier

- Size, design, fabricate and install replacement finials for bridge pillars

Location: Larbert

Contact: Mandy Brown 01324506566

Publication Date: 18/01/2017

 

Contract Authority: Scottish Prison Service

Details: The objective of this project is to replace the existing, unserviceable refrigerant based reverse cycle (heating and cooling) systems which service parts of the Gate Building. The existing systems shall be decommissioned, safety degassed, removed with the refrigerant recovered and recycling to serve the new installations.

The primary equipment which comprises the existing installation is as follows:

  • External Units – Daikin Twinned Unit
  • Internal Units – Daikin Four way blow, recessed units (8 Number)
  • The new system shall comprise the following:

    • Two / twinned external units
    • Eight internal units (recessed units)
    • Interconnecting refrigerant pipework
    • Interconnecting cabling and power installations between and to the internal and external units
    • All necessary amendments to the existing condensate pipework to serve the new systems
    • Location: Glasgow

      Contact: Matthew Christie 0 1313303775