Construction leads and tenders - January 19th
MIXED USE and NON-RESIDENTIAL
Applicant: Blocwork LLP
Planning Authority: Glasgow
Details: Construction of student accommodation and associated landscaping
Location: Site on corner of Teviot Street/ Gilbert Street, Glasgow
Agent: Ryder Architecture, Per David Buchan, 221 West George Street, Glasgow
RESIDENTIAL – TEN UNITS OR MORE
Applicant: Merchant Homes Partnerships Ltd and Home Group
Planning Authority: Glasgow
Details: Construction of residential development (24 units) and associated parking and landscaping
Location: Site formerly known as 15 Ashtree Road, Glasgow
Agent: Graeme Nicholls Architects Limited, Per Graeme Nicholls, Flat 403, 90 Great Western Road, Glasgow
RESIDENTIAL – FEWER THAN TEN UNITS
Applicant: Mr Ali
Planning Authority: Glasgow
Details: Construction of flatted property (3 units) above existing retail units.
Location: 186 - 192 London Road, Glasgow
Agent: David Hughes, 396A Albert Drive, Glasgow
TENDERS
Contract Authority: Falkirk Council
Details: This contract will restore the remnant Dorrator “Swing” Bridge pillar structure and concrete plinths, construct new path access and install a new seating area by the River Carron, Larbert. Any treatment applied to the remnant bridge structure will prevent further corrosion and deterioration for a minimum of 25 years. The project also involves cleaning up and repainting the existing car park vehicle barrier adjacent to the bridge area (Bill of Quantities and Specifications have been uploaded to this site).
Works include:
- Cleaning, preparing and restoring the remaining Swing Bridge pillars
- Repair concrete plinths on north and south of the River
- Cleaning, preparing, restoring and reattaching bridge cable to existing pillars on south bank of river. The contractor will also need to design and install a new ground anchor point
- Supply and install a steel interpretative bench
- Install new sections of 2m wide bitmac paths linking existing path network to seating area and bitmac surfacing for seating area
- Clean, prepare and repaint existing car park area vehicle barrier
- Size, design, fabricate and install replacement finials for bridge pillars
Location: Larbert
Contact: Mandy Brown 01324506566
Publication Date: 18/01/2017
Contract Authority: Scottish Prison Service
Details: The objective of this project is to replace the existing, unserviceable refrigerant based reverse cycle (heating and cooling) systems which service parts of the Gate Building. The existing systems shall be decommissioned, safety degassed, removed with the refrigerant recovered and recycling to serve the new installations.
The primary equipment which comprises the existing installation is as follows:
The new system shall comprise the following:
Location: Glasgow
Contact: Matthew Christie 0 1313303775
Publication Date: 18/01/2017