Construction leads - April 10th

MIXED USE and NON-RESIDENTIAL

Applicant: Edinburgh Palette

Planning Authority: Glasgow

Details: Multi-use development comprising creation of studios and workspaces using converted site accommodation units, internal alterations and extension to existing warehouse for use as an assembly space, and construction of timber cabins within woodland area for community group use.



Location: 19 Stanley Street, Edinburgh

Agent: Akiko Kobayashi Codebase (Creative Floor) 38 Castle Terrace, Edinburgh

Reference: 19/01430/FUL

Application Link  



 

Applicant: Canongate Limited.

Planning Authority:  Glasgow

Details: Change of use from office to form 11 commercially managed short term let apartments, alterations to the rear elevation and roof, and creation of a ground floor class 1 & 2 unit. 



Location: GF 126 Canongate, Edinburgh

Agent: JLL. FAO: Steven Black, 7 Exchange Crescent, Edinburgh

Reference: 19/01404/FUL

Application Link 



 

RESIDENTIAL – TEN UNITS OR MORE

Applicant: David Tannen Charitable Trust

Planning Authority: Glasgow

Details: Use of offices as residential flats (71 Units) and associated works.

Location: Dalian House, 350 St Vincent Street, Glasgow

Agent: Young and Gault, Merlin House, Suite 3, Third Floor, Mossland Road, Glasgow

Reference: 19/01035/FUL

Application Link  

 

TENDERS

Contract Authority: NHS Greater Glasgow and Clyde

Details: NHS Greater Glasgow and Clyde are seeking to appoint a principle contractor for works associated with the refurbishment of existing in-patient ward 27 at the Glasgow Royal Infirmary. This refurbishment will be extensive and include the strip out of existing services and finishes back to shell to allow the area to be brought up to standards expected of a modern healthcare environment. Works will also be carried out in a live hospital environment requiring the appointed contractor to understand and co-ordinate the various phases of works to ensure that disruption to the daily operation of the building is kept to a minimum.

Location: Glasgow

Contact: thomas.mills@ggc.scot.nhs.uk

Publication Date: 09/04/2019

 

Contract Authority: Balfour Beatty Construction Limited

Details: Sub-Contract Opportunity The works comprise the design and construction of 9.5km of new carriageway alongside the existing A9, the reconstruction of the existing A9 and associated utility diversions and accommodation works. New grade separated junctions will be constructed at Tullybelton and Bankfoot and there are seven principal structures and various culverts.

Location: Luncarty to Pass of Birnam

Contact: Craig Letson 01698647500

Publication Date: 09/04/2019

Share icon
Share this article:

Related Articles