MIXED USE and NON-RESIDENTIAL

Applicant: Drum Buchanan Wharf 5 Ltd

Planning Authority: Glasgow 

Details: Mixed Use Development to include offices, residential, shops/retail, offices and restaurants/public houses and creche together with parking, access, landscaping, public realm & infrastructure Works 



Location: Site Bounded By Clyde Place/Commerce Street/Kingston Street/West Street/ Centre Street Glasgow

Agent: Zander Planning Ltd Per Alex Mitchell 31 Balmoral Drive Bishopton

Reference: 19/01013/MSC

Application Link 



 

Applicant: Vinanian Developments Ltd

Planning Authority: Glasgow  

Details: Construction of plastic recycling facility (Class 5) to vacant land, with associated loading areas, landscaping, access and car parking



Location: Site 1, Fifty Pitches Road, Glasgow

Agent: Young and Gault Architects Ltd, Warren Green, Suite 3, 3rd Floor, Merlin House, Mossland Road, Hillington, Glasgow

Reference: 19/00709/FUL

Application Link  



 

RESIDENTIAL – FEWER THAN TEN UNITS

Applicant: Secretary Of State For Defence.

Planning Authority: Edinburgh

Details: Planning Permission in Principle for proposed construction of 2 (no.) new living accommodation units with ancillary water tank and pump house, and new build mechanical transport (MT) facility.

Location: 3 Dreghorn Barracks, 82 Redford Road, Edinburgh

Agent: AECOM. FAO: Ryan Blair, Apex 2, 97 Haymarket Terrace, Edinburgh

Reference: 19/01841/PPP

Application Link 

 

TENDERS

Contract Authority: Scottish Borders Housing Association

Details: SBHA has a stock of 5,646 properties. All require a 5 year electrical safety inspection along with around 624 communal areas with lighting. All properties must also be LD2 Grade D/F compliant by 29th January 2021. 2,646 currently have or are scheduled in an existing programme of works to be LD2 Grade D/F compliant by 29th January 2021. The purpose of the works included in this contract is to ensure compliance of the remaining properties to LD2 by 29th January 2021

Location: Scottish Borders

Contact: enquiries@sbha.org.uk

Publication Date: 24/04/2019

 

Contract Authority: Inverclyde Council

Details: Works will include but not limited to:

- Removal of existing pedestrian parapet

- Construction of RC blisters to accommodate new pedestrian parapet system

- Concrete remedial works to footbridge deck and RC piers as highlighted on the contract drawings.

- Set up and maintain pedestrian diversion route as identified by Inverclyde Council

- Work within the safe parameters stipulated by Network Rail when entering their land.

- Works will be carried out between 21:00 and 05:00 (9pm and 5am)

Location: Bogston Ramp

Contact: gary.sweeney@inverclyde.gov.uk

Publication Date: 25/04/2019