Construction leads - April 29th
MIXED USE and NON-RESIDENTIAL
Applicant: Drum Buchanan Wharf 5 Ltd
Planning Authority: Glasgow
Details: Mixed Use Development to include offices, residential, shops/retail, offices and restaurants/public houses and creche together with parking, access, landscaping, public realm & infrastructure Works
Location: Site Bounded By Clyde Place/Commerce Street/Kingston Street/West Street/ Centre Street Glasgow
Agent: Zander Planning Ltd Per Alex Mitchell 31 Balmoral Drive Bishopton
Reference: 19/01013/MSC
Application Link
Applicant: Vinanian Developments Ltd
Planning Authority: Glasgow
Details: Construction of plastic recycling facility (Class 5) to vacant land, with associated loading areas, landscaping, access and car parking
Location: Site 1, Fifty Pitches Road, Glasgow
Agent: Young and Gault Architects Ltd, Warren Green, Suite 3, 3rd Floor, Merlin House, Mossland Road, Hillington, Glasgow
Reference: 19/00709/FUL
Application Link
RESIDENTIAL – FEWER THAN TEN UNITS
Applicant: Secretary Of State For Defence.
Planning Authority: Edinburgh
Details: Planning Permission in Principle for proposed construction of 2 (no.) new living accommodation units with ancillary water tank and pump house, and new build mechanical transport (MT) facility.
Location: 3 Dreghorn Barracks, 82 Redford Road, Edinburgh
Agent: AECOM. FAO: Ryan Blair, Apex 2, 97 Haymarket Terrace, Edinburgh
Reference: 19/01841/PPP
Application Link
TENDERS
Contract Authority: Scottish Borders Housing Association
Details: SBHA has a stock of 5,646 properties. All require a 5 year electrical safety inspection along with around 624 communal areas with lighting. All properties must also be LD2 Grade D/F compliant by 29th January 2021. 2,646 currently have or are scheduled in an existing programme of works to be LD2 Grade D/F compliant by 29th January 2021. The purpose of the works included in this contract is to ensure compliance of the remaining properties to LD2 by 29th January 2021
Location: Scottish Borders
Contact: enquiries@sbha.org.uk
Publication Date: 24/04/2019
Contract Authority: Inverclyde Council
Details: Works will include but not limited to:
- Removal of existing pedestrian parapet
- Construction of RC blisters to accommodate new pedestrian parapet system
- Concrete remedial works to footbridge deck and RC piers as highlighted on the contract drawings.
- Set up and maintain pedestrian diversion route as identified by Inverclyde Council
- Work within the safe parameters stipulated by Network Rail when entering their land.
- Works will be carried out between 21:00 and 05:00 (9pm and 5am)
Location: Bogston Ramp
Contact: gary.sweeney@inverclyde.gov.uk
Publication Date: 25/04/2019