Construction leads - August 25th

MIXED USE and NON-RESIDENTIAL

 Applicant: Mr & Mrs Harpal Singh & Rajwant Kaur Gora

Planning Authority: Aberdeenshire  

Details: Demolition of Existing Shop Unit and Construction of New Shop Unit (Use Class 1)  



Location: Port Paper Shop Elphinstone Road Port Elphinstone Inverurie Aberdeenshire

Agent: Deemount Design 12 Deemount Road Ferryhill Aberdeen

Reference: APP/2022/1616

Application Link 



 

RESIDENTIAL – TEN UNITS OR MORE

Applicant: Grampian Housing Association

Planning Authority: Aberdeenshire  



Details: Construction of 12 Flats, 7 Dwellinghouses and Associated Infrastructure

Location: Site At Former Storage Yard North Street Peterhead Aberdeenshire

Agent: The Architecture + Planning 24 North Silver Street Aberdeen

Reference: APP/2022/1663



Application Link 

 

RESIDENTIAL – FEWER THAN TEN UNITS

Applicant: Claymore Homes Aden Business Park Newlands Road Mintlaw Aberdeenshire

Planning Authority: Aberdeenshire 

Details: Construction of 2 Dwellinghouses

Location: Plots 4A & 4B Fourwinds Stuartfield Perterhead 

Agent: None

Reference: APP/2022/1754

Application Link 

 

TENDERS 

Contract Authority: Highland Reserve Forces and Cadets Association

Details: Replacing the existing gas fired boilerplant and associated installations in Block 4

Commissioning each new system including all test certification

Provision of Building Manuals complete with record drawings, copies of test and commissioning certification together with manufacturers’ product information.

Maintenance of the new installations during the rectification period

Removal and disposal of all redundant installations

Location: Dundee

Contact: hi-estatese@rfca.mod.uk

Publication Date: 24/08/2022

 

Contract Authority: Cairn Housing Association

Details: The works comprise the replacement of the

existing kitchen fitments with new units, sinks and worktops to fifty occupied houses along with all necessary repairs and alterations to the existing kitchens required as a result of the works, electrical works, vinyl flooring works and complete decoration of the kitchen. The individual kitchen layouts are to be measured up and designed by the Contractor and agreed with the Employer under the Contractors Design Portion, the required units sinks and worktops will subsequently be supplied and fitted by the Contractor at the rates submitted in the Bill of Quantities. Please note that the Contractor will be responsible for programming the works and informing the Tenants of the properties of dates for access.

Location: Caithness

Contact: enquiries@cairnha.com

Publication Date: 24/08/2022

Share icon
Share this article:

Related Articles