Construction leads - August 25th
MIXED USE and NON-RESIDENTIAL
Applicant: Mr & Mrs Harpal Singh & Rajwant Kaur Gora
Planning Authority: Aberdeenshire
Details: Demolition of Existing Shop Unit and Construction of New Shop Unit (Use Class 1)
Location: Port Paper Shop Elphinstone Road Port Elphinstone Inverurie Aberdeenshire
Agent: Deemount Design 12 Deemount Road Ferryhill Aberdeen
Reference: APP/2022/1616
Application Link
RESIDENTIAL – TEN UNITS OR MORE
Applicant: Grampian Housing Association
Planning Authority: Aberdeenshire
Details: Construction of 12 Flats, 7 Dwellinghouses and Associated Infrastructure
Location: Site At Former Storage Yard North Street Peterhead Aberdeenshire
Agent: The Architecture + Planning 24 North Silver Street Aberdeen
Reference: APP/2022/1663
Application Link
RESIDENTIAL – FEWER THAN TEN UNITS
Applicant: Claymore Homes Aden Business Park Newlands Road Mintlaw Aberdeenshire
Planning Authority: Aberdeenshire
Details: Construction of 2 Dwellinghouses
Location: Plots 4A & 4B Fourwinds Stuartfield Perterhead
Agent: None
Reference: APP/2022/1754
Application Link
TENDERS
Contract Authority: Highland Reserve Forces and Cadets Association
Details: Replacing the existing gas fired boilerplant and associated installations in Block 4
Commissioning each new system including all test certification
Provision of Building Manuals complete with record drawings, copies of test and commissioning certification together with manufacturers’ product information.
Maintenance of the new installations during the rectification period
Removal and disposal of all redundant installations
Location: Dundee
Contact: hi-estatese@rfca.mod.uk
Publication Date: 24/08/2022
Contract Authority: Cairn Housing Association
Details: The works comprise the replacement of the
existing kitchen fitments with new units, sinks and worktops to fifty occupied houses along with all necessary repairs and alterations to the existing kitchens required as a result of the works, electrical works, vinyl flooring works and complete decoration of the kitchen. The individual kitchen layouts are to be measured up and designed by the Contractor and agreed with the Employer under the Contractors Design Portion, the required units sinks and worktops will subsequently be supplied and fitted by the Contractor at the rates submitted in the Bill of Quantities. Please note that the Contractor will be responsible for programming the works and informing the Tenants of the properties of dates for access.
Location: Caithness
Contact: enquiries@cairnha.com
Publication Date: 24/08/2022