Construction leads - December 14th

MIXED USE and NON-RESIDENTIAL

Applicant:  City Of Edinburgh Council. FAO: Ryan Moffat 1.6 Waverley Court 4 East Market Street Edinburgh

Planning Authority: Edinburgh

Details: The project is to deliver a new 800 pupil high school building, it aims to consolidate the educational facilities into one building, allowing for community use whilst retaining shared facilities in the existing community centre building.

Location: Wester Hailes Education Centre 5 Murrayburn Drive Edinburgh 

Agent: Applicant

Reference: 22/06013/PAN

Application Link 

 

Applicant:  The City Of Edinburgh Council.

Planning Authority: Edinburgh

Details: Construction of new modular building within the rear area of Granton Primary School. This building will house a new commercial kitchen facility. Installation of small external good lift to assist with transporting of food products. New 2.4m high boundary fence for security purposes, this will include one new vehicle entrance creating a one-way traffic system through the area.

Location: Granton Primary School 59 Boswall Parkway Edinburgh

Agent: CEC - Waverley Court. FAO: Barbara Harvey 1.6 Waverley Court 4 East Market Street Edinburgh

Reference: 22/05971/FUL

Application Link 

 

Applicant: National Trust For Scotland.

Planning Authority: Edinburgh

Details: External fabric repairs slates roof coverings taken down and reviewed, existing harling to the elevations, windows are to be overhauled. Gutters and downpipes. 

Location: Malleny House 4 Malleny Balerno

Agent: Gleeds. FAO: Hannah McMillan 163 West George Street Glasgow

Reference: 22/05944/LBC

Application Link 

 

TENDERS

Contract Authority: Falkirk Council

Details: Removal of render to external walls of 14 storey tower block, design and install rainscreen cladding. Replacement windows, new pitched roof structure and caldding

Location: Falkirk

Contact: lynda.luke@falkirk.gov.uk

Publication Date: 13/12/2022

 

Contract Authority: Historic Environment Scotland

Details: Generally the works comprise the replacement of an existing septic tank with a new treatment plant and UV chamber. Replacement of existing pipes, and installation of new manholes/inspection chambers and outfall pipe are also included.

Location: Dunstaffnage

Contact: ben.hopkin@hes.scot

Publication Date: 13/12/2022

Share icon
Share this article:

Related Articles