Construction leads - December 22nd
MIXED USE and NON-RESIDENTIAL
Applicant: Peak Reserve Power Ltd
Planning Authority: Aberdeen
Details: Major development for construction of battery based energy storage facility
Location: Site at Farburn Place, Dyce, Aberdeen
Agent: RPS Consulting, Jonathan Smith, Sherwood House, Sherwood Avenue, Newark
Reference: 201599/PAN
Application Link
RESIDENTIAL – TEN UNITS OR MORE
Applicant: Cala Homes West, Per Thomas Lawlor, Cairnlee House, Calendar Business Park, Callendar Road, Glasgow
Planning Authority: Glasgow
Details: Construction of residential development and associated infrastructure including demolition of non-listed building, formation of car parking and provision of landscaping
Location: Site Formerly Known As Jordanhill College, 76 Southbrae Drive, Glasgow
Agent: Applicant
Reference: 20/03141/FUL
Application Link
RESIDENTIAL – FEWER THAN TEN UNITS
Applicant: RIG Engineering SAS Limited
Planning Authority: Aberdeen
Details: Change of use from class 2 (financial, professional and other services) to form 3 residential flats (sui generis) and installation of replacement windows
Location: Rig Engineering Sas Ltd, 621-627 George Street, Aberdeen
Agent: Raymond Simpson Associates Ltd, 7 Mid Stocket Road, Aberdeen
Reference: 201556/DPP
Application Link
TENDERS
Contract Authority: Scottish Prison Service
Details: This project is to provide for the design, supply and installation of replacement LED lighting to the Association Areas of Ingliston House and Hermiston House at HMP Edinburgh. The Contractor shall also replace all general and emergency lighting with LED equivalents in accordance with the relevant British Standards.
Location: Edinburgh
Contact: stuart.dodds@sps.pnn.gov.uk
Publication Date: 22/12/2020
Contract Authority: Thenue Housing Association Limited
Details: Annual/Cyclical painting to external/internal common elements of existing housing stock
Location: Glasgow
Contact: stephen@mblh.co.uk
Publication Date 22/12/2020