Construction leads - December 22nd
MIXED USE and NON-RESIDENTIAL
Applicant: Oregon Timber Frame Limited
Planning Authority: Scottish Borders
Details: Demolition of car showroom and construction of a new office building with associated landscaping, parking and infrastructure works.
Location: Belmont Garage Dunsdale Haugh Selkirk Scottish Borders
Agent: Ferguson Planning Ltd 37 George Street Edinburgh
Reference: 22/01907/FUL
Application Link
RESIDENTIAL – TEN UNITS OR MORE
Applicant: Network Rail
Planning Authority: Glasgow
Details: Construction of residential development (in Principle), associated car parking and amenity
Location: Site To The West Of 145 Kelvinhaugh Street Glasgow
Agent: Ryder Architecture Chris Malcolm 221 West George Street Glasgow
Reference: 22/03055/PPP
Application Link
TENDERS
Contract Authority: Argyll and Bute Council
Details: Phase 2 of the works is being undertaken to complete the seawall height extension and post and rail replacement to the length of seawall from the slipway next to Tobermory river, up to and including Fisherman’s Pier – Approximately 200m length total.
The inclusion of proposed Contractor designed removable flood barrier at Fisherman’s Pier and a hinged flood gate at the narrow shore access (next to the ice cream shop) with valved drainage along the full length will complete the enhanced flood protection of the existing seawall.
Location: Tobermory
Contact: elaine.appleby@argyll-bute.
Publication Date: 21/12/2022
Contract Authority: Falkirk Council
Details: Strip off existing roof covering and renew with concrete tiles including vapour membrane, battens, tiles, valleys, hips, ridges etc.
Re-roughcasting existing structure with metal lathing overcoat system.
Replacement of gutters and downpipes.
Gas alterations as required.
Insulation as required
Location: Grangemouth
Contact: neil.wood@falkirk.gov.uk
Publication Date: 21/12/2022