Construction leads - December 22nd

MIXED USE and NON-RESIDENTIAL

Applicant: Oregon Timber Frame Limited

Planning Authority: Scottish Borders

Details: Demolition of car showroom and construction of a new office building with associated landscaping, parking and infrastructure works.

Location: Belmont Garage Dunsdale Haugh Selkirk Scottish Borders

Agent: Ferguson Planning Ltd 37 George Street Edinburgh

Reference: 22/01907/FUL

Application Link 

 

RESIDENTIAL – TEN UNITS OR MORE

Applicant: Network Rail

Planning Authority: Glasgow

Details: Construction of residential development (in Principle), associated car parking and amenity

Location: Site To The West Of 145 Kelvinhaugh Street Glasgow

Agent: Ryder Architecture Chris Malcolm 221 West George Street Glasgow

Reference: 22/03055/PPP

Application Link 

 

TENDERS

Contract Authority: Argyll and Bute Council

Details: Phase 2 of the works is being undertaken to complete the seawall height extension and post and rail replacement to the length of seawall from the slipway next to Tobermory river, up to and including Fisherman’s Pier – Approximately 200m length total.

The inclusion of proposed Contractor designed removable flood barrier at Fisherman’s Pier and a hinged flood gate at the narrow shore access (next to the ice cream shop) with valved drainage along the full length will complete the enhanced flood protection of the existing seawall.

Location: Tobermory

Contact: elaine.appleby@argyll-bute.gov.uk

Publication Date: 21/12/2022

 

Contract Authority: Falkirk Council

Details: Strip off existing roof covering and renew with concrete tiles including vapour membrane, battens, tiles, valleys, hips, ridges etc.

Re-roughcasting existing structure with metal lathing overcoat system.

Replacement of gutters and downpipes.

Gas alterations as required.

Insulation as required

Location: Grangemouth

Contact: neil.wood@falkirk.gov.uk

Publication Date: 21/12/2022

Share icon
Share this article:

Related Articles