Construction leads - December 23rd
MIXED USE and NON-RESIDENTIAL
Applicant: The Hotel Collection Hotel No 2. Limited.
Planning Authority: Edinburgh
Details: Formation of new guest bedrooms partially within the existing roof structure and partially on top of the existing roof structure at the sixth-floor level.
Location: Carlton Highland Hotel, 19 North Bridge, Edinburgh
Agent: Walsingham Planning. FAO: Bruce Risk Brandon House, King Street, Knutsford
Reference: 19/05833/FUL
Application Link
Applicant: Edinburgh Hindu Mandir and Cultural Centre.
Planning Authority: Edinburgh
Details: Rear extension to Hindu Centre.
Location: Edinburgh Hindu Mandir and Cultural Centre, 2 St Andrew Place, Edinburgh
Agent: Slorach Wood Architects. The Station Masters Office, Dalmeny Station, South Queensferry
Reference: 19/05825/FUL
Application Link
Applicant: Erskine Stewart’s Melville Schools.
Planning Authority: Edinburgh
Details: Proposal is to demolish part of the brown brick extension (a later addition built in 1974) to the original Wallace Dunlop Hall (originally built in 1909) to the extent shown on the attached site plans. The proposed building will adjoin the listed Wallace Dunlop Hall via a small glazed link which is considered to be a far more sensitive architectural connection than the existing.
Location: Stewart’s Melville College, 3 Queensferry Road, Edinburgh
Agent: Squires And Brown. FAO: Rick Barber Squires And Brown, Mallory House, Goostrey Way, Knutsford
Reference: 19/05818/LBC
Application Link
TENDERS
Contract Authority: Midlothian Council
Details: The project is the works to extend Woodburn Primary School by three additional classrooms and an activity hall on the area currently occupied by the MUGA and the subsequent re-construction of the MUGA in a new location at Woodburn Primary School.
Location: Dalkeith
Contact: hugh.meikle@midlothian.gov.uk
Publication Date: 23/12/2019
Contract Authority: Atrium Homes
Details: The service comprises the annual service and maintenance to all Association owned appliances of gas heating systems and appliances following manufacturer’s requirements and shall include everything necessary for this check, including but not restricted to all labour, parts etc of all gas installations, including appliances and flues.
Location: Kilmarnock
Contact: info@atrium-homes.co.uk
Publication Date: 23/12/2019