Construction leads - February 3rd

MIXED USE and NON-RESIDENTIAL

Applicant: Brave New Spirits Ltd

Planning Authority: Glasgow

Details: Construction of warehouse (Class 6).

Location: 331 Charles Street Glasgow 

Agent: Algo

Reference: 23/00077/FUL

Application Link 

 

RESIDENTIAL – FEWER THAN TEN UNITS

Applicant: Colaren Farms Ltd

Planning Authority: Aberdeenshire   

Details: Construction of 3 Dwellinghouses

Location: Site At Little Burnthill Fraserburgh Aberdeenshire 

Agent: Ecotech Architecture 7 Wallace Way Fraserburgh

Reference: APP/2023/0090

Application Link 

 

Applicant: Mantell RItchie 27A High Street Banff

Planning Authority: Aberdeenshire 

Details: Construction of 3 Dwellinghouses 

Location: Site At Ladybrae Cottage Ladysbridge Banff 

Agent: Applicant

Reference: APP/2023/0095

Application Link 

 

TENDERS

Contract Authority: Dumfries and Galloway Health Board

Details: NHS Dumfries & Galloway (NHSD&G) is seeking to appoint a Heating Engineer Term Contractor to provide regular servicing, planned preventative maintenance and reactive repairs of gas / oil boilers on all NHSD&G properties in a professional manner leading to a prompt resolution of any problems that may affect the efficient delivery of services by NHSD&G. Scope of works could range from rudimentary boiler repairs to full boiler replacement.

Location: Dumfries and Galloway

Contact: NHS Dumfries & Galloway (NHSD&G) is seeking to appoint a Heating Engineer Term Contractor to provide regular servicing, planned preventative maintenance and reactive repairs of gas / oil boilers on all NHSD&G properties in a professional manner leading to a prompt resolution of any problems that may affect the efficient delivery of services by NHSD&G. Scope of works could range from rudimentary boiler repairs to full boiler replacement.

Publication Date: 30/01/2023

 

Contract Authority: Lowland Reserve Forces and Cadets Association

Details: Uplift the existing pathing to the side path and front of the hut.

- Lay external pathing to required areas surrounding the hut.

- Prepare ground and construct new disabled ramps at front and side of the hut.

- Remove and dispose of existing side fire exit door and new front door.

- Supply, transport and install new fire exit door and front door to required standard.

- Apply obscure window film to the panes of newly created toilet within the hut.

- Remove all associated debris from site upon completion.

Location: Portobello

Contact: lo-estatesworkse@rfca.mod.uk

Publication Date: 30/01/2023

Share icon
Share this article:

Related Articles