Construction leads - February 3rd
MIXED USE and NON-RESIDENTIAL
Applicant: Brave New Spirits Ltd
Planning Authority: Glasgow
Details: Construction of warehouse (Class 6).
Location: 331 Charles Street Glasgow
Agent: Algo
Reference: 23/00077/FUL
Application Link
RESIDENTIAL – FEWER THAN TEN UNITS
Applicant: Colaren Farms Ltd
Planning Authority: Aberdeenshire
Details: Construction of 3 Dwellinghouses
Location: Site At Little Burnthill Fraserburgh Aberdeenshire
Agent: Ecotech Architecture 7 Wallace Way Fraserburgh
Reference: APP/2023/0090
Application Link
Applicant: Mantell RItchie 27A High Street Banff
Planning Authority: Aberdeenshire
Details: Construction of 3 Dwellinghouses
Location: Site At Ladybrae Cottage Ladysbridge Banff
Agent: Applicant
Reference: APP/2023/0095
Application Link
TENDERS
Contract Authority: Dumfries and Galloway Health Board
Details: NHS Dumfries & Galloway (NHSD&G) is seeking to appoint a Heating Engineer Term Contractor to provide regular servicing, planned preventative maintenance and reactive repairs of gas / oil boilers on all NHSD&G properties in a professional manner leading to a prompt resolution of any problems that may affect the efficient delivery of services by NHSD&G. Scope of works could range from rudimentary boiler repairs to full boiler replacement.
Location: Dumfries and Galloway
Contact: NHS Dumfries & Galloway (NHSD&G) is seeking to appoint a Heating Engineer Term Contractor to provide regular servicing, planned preventative maintenance and reactive repairs of gas / oil boilers on all NHSD&G properties in a professional manner leading to a prompt resolution of any problems that may affect the efficient delivery of services by NHSD&G. Scope of works could range from rudimentary boiler repairs to full boiler replacement.
Publication Date: 30/01/2023
Contract Authority: Lowland Reserve Forces and Cadets Association
Details: Uplift the existing pathing to the side path and front of the hut.
- Lay external pathing to required areas surrounding the hut.
- Prepare ground and construct new disabled ramps at front and side of the hut.
- Remove and dispose of existing side fire exit door and new front door.
- Supply, transport and install new fire exit door and front door to required standard.
- Apply obscure window film to the panes of newly created toilet within the hut.
- Remove all associated debris from site upon completion.
Location: Portobello
Contact: lo-estatesworkse@rfca.mod.uk
Publication Date: 30/01/2023