Construction leads - January 17th

MIXED USE and NON-RESIDENTIAL

Applicant: Grampian (Southern) Housing Society Limited

Planning Authority: Aberdeen

Details: Construction of single storey office/reception building with ramp; formation of wall opening to install gate and construction of wall



Location: Bloomfield Place, Aberdeen

Agent: Raymond Simpson Associates Ltd, 7 Mid Stocket Road, Aberdeen

Reference: 182161/DPP

Application Link 



 

RESIDENTIAL – TEN UNITS OR MORE

Applicant: LAR Housing Trust

Planning Authority: East Lothian   



Details: Construction of 4 houses, 22 flats and associated works  

Location: Land west of Johnnie Cope’s Road, Mid Road, Prestonpans

Agent: Holder Planning, Per Robin Holder, 5 South Charlotte Street, Edinburgh

Reference: 18/01344/P



Application Link

 

RESIDENTIAL – FEWER THAN TEN UNITS

Applicant: ABZ Property Development 

Planning Authority: Aberdeen 

Details: Conversion of existing restaurant into 6 flats including installation of replacement windows; formation of new windows and entrance door; removal of ventilation extract; formation of external storage; demolition of existing outhouse to rear along with associated works to form amenity space and car parking

Location: Ciao Napoli, 10 Bon-Accord Crescent, Aberdeen

Agent: MAC Architects, 24 Oldmeldrum Road, Newmachar

Reference: 190012/DPP

Application Link  

 

TENDERS

Contract Authority: Dundee City Council

Details: The requirement here is for Pier and Column Inspections for the Tay Road Bridge, Dundee. The aim of the proposed contract is to engage with suitably competent contractor(s) to access the upper 2.4 metres of the concrete river piers and the entire section of the columns of the Tay Road Bridge, clean and inspect all surfaces, identify and mark out defective areas of concrete and photograph, report on and reference identified defects.

Location: The Tay

Contact: amanda.walsh@dundeecity.gov.uk

Publication Date: 16/01/2019

 

Contract Authority: Renfrewshire Council

Details: Renfrewshire Council wishes to appoint a suitably experienced contractor to design, construct and deliver a fully fitted out changing container to site and install on a ready constructed substructure, within Moredun Playing Fields

Location: Paisley.

Contact: joyce.boutiche@renfrewshire.gov.uk

Publication Date: 16/01/2019