Construction leads - January 18th
MIXED USE and NON-RESIDENTIAL
Applicant: Royal College Of General Practitioners.
Planning Authority: Edinburgh
Details: Internal fit-out at first floor of 38 Thistle Street. The works will generally comprise: Construction of two offices and a meeting room with a mixture of plasterboard and glazed partitions and glass doors. Installation of new kitchenette with hot water heater. New vinyl floor to kitchenette. Installation of secondary glazing to windows. Alterations to existing LED panel lighting layout to suit new layout. Installation of Passive Infrared Red (PIR) controls for lighting. Installation of comms cabinet and cabling through existing trunking and additional trunking as required to offices. Alterations to existing fire alarm to suit new layout.
Location: Unit 1, 28 - 38 Thistle Street, Edinburgh
Agent: TFT Consultants. FAO: Matt Acton, Exchange Place, 3 Semple Street, Edinburgh
Reference: 21/06798/LBC
Application Link
Applicant: Empiric (Edinburgh Southbridge) Limited.
Planning Authority: Edinburgh
Details: External alterations, associated with modernisation of existing student accommodation, at 53-69 South Bridge/ 1A Drummond Street
Location: 54, 63 South Bridge & 1A Drummond Street, Edinburgh
Agent: Scott Hobbs Planning Ltd. FAO: Julia Frost, 24A Stafford Street, Edinburgh
Reference: 21/06739/FUL
Application Link
RESIDENTIAL – TEN UNITS OR MORE
Applicant: City Of Edinburgh Council.
Planning Authority: Edinburgh
Details: Replace the single storey street cleansing office and car park with a 4 storey residential block including amenity space and planting space for both tenants and the nursery opposite.
Location: 6 Cowan’s Close, Edinburgh
Agent: Anderson Bell Christie Architects. FAO: Rekha Barry, 382 Great Western Road, Glasgow
Reference: 21/06745/FUL
Application Link
TENDERS
Contract Authority: South Islay Development
Details: Construction of a new Community Hub and associated infrastructure works and expansion of existing motorhome site
Location: Port Ellen Isle of Islay
Contact: portellenplayingfields@gmail.
Publication Date: 18/01/2022
Contract Authority: Fife Council
Details: Supply, Install, Commission and Maintain Replacement Boiler
Location: Star Village Hall
Contact: Colin.Ferguson-BS@fife.gov.uk
Publication Date: 18/01/2022