Construction leads - January 19th
MIXED USE and NON-RESIDENTIAL
Applicant: Keir Construction Ltd For Scottish Prison Service
Planning Authority: Glasgow
Details: Construction of prison (Class 8a) and associated works (Environmental Impact Assessment) - approval of matters specified in conditions 2, 3, 5, 12 and 18 of 19/03888/PPP relating to site layout/masterplan/travel plan.
Location: Site At Provanmill Adjacent To The Provan Gas Holder Station On Royston Road Glasgow
Agent: Cameron Planning Steven Cameron Clifton Cottage 29 East Argyle Street Helensburgh
Reference: 22/03209/MSC
Application Link
Applicant: Varsity Developments
Planning Authority: Glasgow
Details: Demolition of unlisted building and part of listed building with associated alterations and construction of office development (Class 4) including ancillary ground floor cafe/restaurant: Application under Section 42 for amendment to wording of Conditions 1, 3, 19, 23 and 25 of planning permission 16/00625/DC to allow changes to construction method and materials of the facade design and timing of submission of detailed information.
Location: 64 - 72A Waterloo Street Glasgow
Agent: Turley Kate Donald 26 Dublin Street Edinburgh
Reference: 22/03192/FUL
Application Link
RESIDENTIAL – FEWER THAN TEN UNITS
Applicant: HJV Consultants Ltd
Planning Authority: Glasgow
Details: Construction of flatted residential development (7no units).
Location: Site Formerly Known As 10 Kelbourne Street Glasgow
Agent: Elder And Cannon Architects John Docherty 40 Berkeley Street Glasgow
Reference: 22/03218/FUL
Application Link
TENDERS
Contract Authority: Aberdeen City Council
Details: The works comprise of carrying out upgrading the existing toilets with new cubicles, toilets, wash hand basins, floor finishes and upgrading of existing electrical and mechanical components.
Location: Aberdeen
Contact: cpssprocurement@aberdeencity.
Publication Date: 19/01/2023
Contract Authority: Dumfries and Galloway Council
Details: The Works generally comprise:
- demolishing existing retaining wall and removing existing paving, steps and handrails;
- construction of new masonry retaining wall with all associated earthworks;
- installation of new land drain with connections to existing drainage system;
- new fencing;
- making good soft landscaping;
- new precast concrete paving; and
- construction of new ramps with associated handrails.
Location: Sanquhar Academy
Contact: Leesa.Rintoul@scotland-excel.
Publication Date: 19/01/2023