Construction leads - January 28th
RESIDENTIAL – FEWER THAN TEN UNITS
Applicant: WB Properties Scotland Ltd, Mr Willie Brown Daldraco, 3 Birniehill Road, Cleland
Planning Authority: Glasgow
Details: Construction of residential development (15 houses) and ancillary works.
Location: Site Adjacent To 1557 Cumbernauld Road, Glasgow
Agent: Applicant
Reference: 21/00015/FUL
Application Link
Applicant: Barratt Homes (Scotland West) Mr David McBride 7 Buchanan Gate Cumbernauld Road Stepps
Planning Authority: Glasgow
Details: Construction of residential development - 3 houses to 8 flats
Location: Site formerly known as 42 Spean Street, Glasgow
Agent: None
Reference: 20/03317/FUL
Application Link
Applicant: Erindale SC Limited
Planning Authority: Glasgow
Details: Use of upper floors and construction of roof extension to form 9 flatted dwellings and associated alterations.
Location: 106 Renfield Street, Glasgow
Agent: Mosaic Architecture and Design, Per Andrew Hadden, 226 West George Street, Glasgow
Reference: 21/00036/FUL
Application Link
TENDERS
Contract Authority: NHS Ayrshire & Arran
Details: NHS Ayrshire and Arran wish to source a suitably competent Contractor to provide a Planned Preventative Maintenance (PPM) Regime for two CHP Units within Biggart Hospital, Prestwick. By generating heat and power, these CHP Units provide power for the whole of Biggart Hospital. This PPM is required in order that these Units are fully maintained to ensure maximum uptime and that the Board can reduce carbon emissions and make use of heat which would otherwise be wasted.
Location: Ayrshire and Arran
Contact: lesley.marshall@aapct.scot.nhs.uk
Publication Date: 27/01/2021
Contract Authority: Aberdeenshire Council
Details: Design and fit out of existing museum space
Location: Banchory
Contact: cpscityshire@aberdeencity.gov.uk
Publication Date: 27/01/2021