Construction leads - January 28th

RESIDENTIAL – FEWER THAN TEN UNITS

Applicant: Backmuir Trading Ltd

Planning Authority: Moray

Details: Demolish disused farmhouse and farm buildings and construction of 3 dwellinghouses



Location: Jocksleys Keith Moray

Agent: John Wink Design Midtown Of Foudland Glens Of Foudland Huntly

Reference: 21/01984/APP

Application Link 



 

Applicant: Morlich Homes Limited 

Planning Authority: Moray

Details: Proposed residential development landscaping and associated infrastructure



Location: R1 Seafield Road Cullen Moray 

Agent: G H Johnston Building Consultants Limited Willow House Stoneyfield Business Park Inverness

Reference: 22/00075/SCN

Application Link 



 

TENDERS

Contract Authority: North Lanarkshire Council

Details: North Lanarkshire Council wishes to establish a contract for the design and installation of new lifts and all associated works in 3Nr domestic tower blocks. The blocks and lifts are;

-Section 1 Burnside Tower: odd lift

-Section 3 Burnside Tower: even lift

-Section 2 Doonside Tower: odd lift

-Section 4 Doonside Tower: even lift

-Section 5 Glassford Tower: odd lift

-Section 6 Glassford Tower: even lift

Location: North Lanarkshire

Contact: contractstrategy@northlan.gov.uk

Publication Date: 27/01/2022

 

Contract Authority: Scottish Prison Service

Details: As part of its wider carbon reduction strategy, the SPS is adopting Electric Vehicles for general transport requirements.

This project provides charging facilities local to five Establishments, both internally and externally to the secure perimeter to extend the current electric vehicle charging infrastructure that has been installed as part of a previous project. The works shall take place at:

HMP Barlinnie;

HMP Perth;

HMP Low Moss;

SPS Central Stores, Fauldhouse; and

SPS College, Polmont.

The Works are to comprise of the design, supply, installation and test and commissioning of EV charging systems.

The Contractor shall be responsible for the provision of all cabling, ducting, containment etc. and all civil works in order to facilitate the installation of the systems including re-instatement of all surfaces to match existing finish.

Location:National

Contact: catharine.dempsey@sps.pnn.gov.uk

Publication Date: 27/01/2022