Construction leads - July 24th

MIXED USE and NON-RESIDENTIAL

Applicant: Parklands View LLP Per CTL Estates

Planning Authority: Glasgow

Details: Major residential development of around 100 to 150 units (mix of house types and flats), potentially including facilities consisting of approximately 1000-3000 sqm of class 1(shops), 2(financial, professional and other services) and class 3(food and drink)



Location: Silverburn House, Claymore Drive, Aberdeen

Agent: Space Solutions, Bishop House, 50 Carden Place, Aberdeen

Reference: 191150/PAN

Application Link 



 

Applicant: Soller One Limited

Planning Authority: Glasgow

Details: Construction of student accommodation, access and associated works, to include demolition of existing building



Location: Site formerly known as 31 Dunblane Street, Glasgow

Agent: Iceni Projects Limited

Reference: 19/02110/FUL

Application Link 



 

RESIDENTIAL – TEN UNITS OR MORE

Applicant: Mr Andy Geddes

Planning Authority: Glasgow

Details: Construction of flatted residential development (40 units) and associated parking, landscaping and drainage

Location: Site formerly known as 213 - 217 Orr Street, Glasgow

Agent: George Buchanan Architects Ltd. Maryhill Burgh Halls, 10-24 Gairbraid Avenue, Glasgow

Reference: 19/01741/FUL

Application Link 

 

TENDERS 

Contract Authority: Charing Cross Housing Association Ltd

Details: Strip and re-felt a flat roof

Location: Glasgow

Contact: alasdair@cxha.org.uk

Publication Date: 23/07/2019

 

Contract Authority: Tollcross Housing Association Limited

Details: Works will comprise of the design supply and installation of gas central heating systems including boiler replacement, radiator replacement, central heating pipework, upgrading of gas supply pipes, plasterwork and other associated works. It is envisaged that not all properties will require the same level of work. The extent of works within each property will therefore be decided during the marchin/survey process. Works will cover a three year period with the option of an extension to a fourth year dependant on contractor performance and the agreement of both parties.

Location: Glasgow

Contact: brian.trearty@tollcross-ha.org.uk

Publication Date: 23/07/2019

Share icon
Share this article:

Related Articles