Construction leads - June 28th

MIXED USE and NON-RESIDENTIAL

Applicant: IHG.

Planning Authority: Edinburgh

Details: Refurbishment of existing bar and restaurant involving the creation of a new entrance opening from the hotel lobby to the restaurant, removal of existing bar and associated fixtures, removal and alteration of wall mouldings, changes to floor finishes

Location: The George Hotel 15 - 25 George Street Edinburgh

Agent: 3D Reid. Euan McLaren 26 Cross Street Manchester

Reference: 23/02478/LBC

Application  LINK

 

Applicant: Klarent Hospitality.

Planning Authority: Edinburgh

Details: Formation of 6 additional guest bedrooms and reduced gym area to basement (level 2); formation of 2 additional guest bedrooms and alterations to route of fire escape linking existing FE stair with exit to Carrubbers Close to basement (level 3).

Location: Carlton Highland Hotel 19 North Bridge Edinburgh

Agent: Fletcher Joseph Associates. Nathan Noble 5 Millar Place Edinburgh

Reference: 23/02369/FUL

Application LINK

 

TENDERS

Contract Authority: Aberdeenshire Council

Details: Replacement of roof cladding

Location: Peterhead

Contact:  cpscityshire@aberdeencity.gov.uk

Publication Date: 23/06/2023

 

Contract Authority: East Renfrewshire Council

Details: The project brief is internal alterations and refurbishment of part of Thornliebank Primary School to provide facilities for the delivery of Gaelic Education.

  • The works include toilet refurbishment, alterations to internal partitions and doors, flooring, decoration and sinks. The project includes a new STEM classroom, works within the playground and signage.
  • The works will be completed during term time and school holidays.
  • Some works need to be completed during the school holidays. The contractor will need to work with the CA and School to programme the works so classes can be moved and, if required, for a temporary fire evacuation plan to be put in place.
  • Thornliebank Primary School has a Listed Building Category B.
  • The existing boy’s toilets are to be refurbished first. Once these are complete, the girls can be refurbished.
  • The new cleaners store must be completed before the existing cleaners store in the girl’s toilets is removed.
  • The school can move two classes at any one time.
  • Hours of working is 7am to 6pm.
  • Access at weekends and on public holidays will need to be arranged with 3 working days’ notice.

Location: Thornliebank Primary School

Contact: ercprocurement@eastrenfrewshire.gov.uk

Publication Date: 23/06/2023

Share icon
Share this article:

Related Articles