Construction leads - March 10th
MIXED USE and NON-RESIDENTIAL
Applicant: City Of Edinburgh Council.
Planning Authority: Edinburgh
Details: Residential led development comprising housing of mixed tenure (social rent, mid-market rent and private sale) with associated Energy Centre, substation, roads and landscaping.
Location: 165 Broughton Road Edinburgh
Agent: Smith Scott Mullan Associates. 378 Leith Walk Edinburgh
Reference: 22/02348/PAN
Application Link
Applicant: Host Student Housing Management (UK) Ltd And McKay Ltd.
Planning Authority: Edinburgh
Details: Proposed demolition of existing office development, construction of new purpose-built student accommodation, including communal amenity space, and conversion of existing residential cottages to associated energy centre, with external landscaping, car parking, cycle parking and ancillary facilities.
Location: 36 - 44 Westfield Road Edinburgh
Agent: Montagu Evans LLP. FAO: Ally Campbell 4th Floor, Exchange Tower 19 Canning Street Edinburgh
Reference: 22/02033/SCR
Application Link
Applicant: Flying Panda.
Planning Authority: Edinburgh
Details: New shop front, internal alterations and all associated site works for class 1 use as existing.
Location: 116B Rose Street Edinburgh
Agent: Format Design. FAO: Shona Mackay Holyrood Business Park 146 Duddingston Road West Edinburgh
Reference: 22/02007/FUL
Application Link
TENDERS
Contract Authority: Scottish Prison Service
Details: This project is to replace the 2No. existing dual fuel hot water boilers which are reaching the end of their economic life at HMP Castle Huntly. The Works shall include the design, installation, testing and commissioning of replacement dual fuel boilers of appropriate output, together with associated pipework, headers, pumps, flues, valves, gas and oil safety systems and controls installations.
Location: Castle Huntly
Contact: Callum.Ross@prisons.gov.scot
Publication Date: 06/05/2022
Contract Authority: Aberdeen City Council
Details: The works comprise of carrying out internal alterations to the existing vestibule of the main front entrance. Replacement external and internal doors. Increase in reception hatch opening and carry out improvements to the school security system.
Location: Aberdeen
Contact: cpssprocurement@aberdeencity.
Publication Date: 09/05/2022