Construction leads - March 16th

MIXED USE and NON-RESIDENTIAL

Applicant: Cala Management Limited.

Planning Authority: Edinburgh

Details: Residential Led Mixed-Use Development including (but not limited to) Retail (Class 1) Professional Services (Class 2), Food and Drink (class 3), Drive Thru Food and Drink including Hot Food (Sui Generis), Business (Class 4), Hotel (Class 7), Care Home (Class 8), Residential Houses (Class 9), Flats (Sui Generis), Primary School (Class 10), and Leisure (Class 1).



Location: Land 288 Metres Southwest Of 10 Builyeon Road South Queensferry

Agent: EMA Architecture + Design. 42 Charlotte Square Edinburgh

Reference: 20/01137/PAN

Application Link  



 

Applicant: George Heriot’s Trust. 

Planning Authority: Edinburgh 

Details: Internal alterations to refurbish existing WCs to lower ground floor, including reconfiguration to provide accessible WC to serve Castle Hall. Internal alterations to form new Support for Learing classroom/office on Mezzanine floor. Addition of new external ramps + steps to form accessible route/accessible escape route to/ from Castle Hall. Addition of new store lift between Castle Hall + Basement Store to provide safe means to move tables and chairs/equipment.



Location: George Heriots School 2 Lauriston Place Edinburgh

Agent: LDN Architects. FAO: Ross Crichton 57-59 Bread Street Edinburgh

Reference: 20/01047/LBC

Application Link  



 

RESIDENTIAL – FEWER THAN TEN UNITS

Applicant: Mr Mark Laird

Planning Authority:Angus  

Details: Planning permission in principle for the change of use of land for the construction of three dwellinghouses and associated private vehicular access arrangements

Location: Land Opposite Royal Jubilee Arms Hotel Dykehead Kirriemuir

Agent: Bell Ingram Design Scott Ramsay Manor Street Forfar

Reference: 20/00156/PPPL

Application Link  

 

TENDERS

Contract Authority: Midlothian Council

Details: Provision of flooring works in accordance with National Schedule of Rates – Building Works

Location: Midlothian

Contact: graham.halliday@midlothian.gov.uk

Publication Date: 13/03/2020

 

Contract Authority: Aberdeenshire Council

Details: Restoration of the Bothy Building including New Slate Roofing, Stone Pointing and Repairs, Replacement RWP Goods and Installation of New Rooflights to the Existing Bothy

Location: Banff

Contact: yvonne.clark2@aberdeenshire.gov.uk

Publication Date: 13/03/2020

Share icon
Share this article:

Related Articles