Construction leads - March 1st

MIXED USE and NON-RESIDENTIAL

Applicant: Mr Stephen Howard

Planning Authority: East Lothian     

Details: Alterations and extension to residential school building to provide additional student boarding accommodation and associated works



Location: 1 And 3 High Street, Musselburgh, East Lothian   

Agent: Cb3 Design Architects, Per Paul Ackerman, Chambers House, 72 High Street, Peebles

Reference: 18/01399/P

Application Link 



 

Applicant: Loretto School  

Planning Authority: East Lothian

Details: Alterations, extension and change of use of former public house to form teaching accommodation (class 10) and associated works



Location: 36 - 38 Millhill, Musselburgh, East Lothian

Agent: Cb3 Design Architects, Per Paul Ackerman, Chambers House, 72 High Street, Peebles

Reference: 18/01373/P

Application Link  



 

TENDERS

Contract Authority: Taigh Sgire Sholais

Details: Tenders are invited for the provision of a Principal Contractor to renovate, the existing School House, bringing it up to modern living standards. This work will be carried out in line with design provided.

Location: Stornoway

Contact: david@tighean.co.uk

Publication Date: 28/02/2019

 

Contract Authority: Caledonian Maritime Assets Ltd (Utility)

Details: It is the intention of the Employer (CMAL) to appoint a suitably experienced contractor to undertake works on the Old Pierhead and Main Approach structures located at Tiree Ferry Terminal, Isle of Tiree. The works will include.

Underwater inspection of jetty piles;

Pile cleaning, painting, and steel jacket repairs;

Demolition, disposal, and replacement of timber fender grillage with new timbers and leg fenders;

Demolition of redundant berthing structure alongside the Main Approach and removal of a redundant store building from the Old Pierhead deck

Repairs works to jetty decks including concrete repairs, refurbishment of bollards, ladders, and sections of parapet;

Underwater filling to voids in the solid section of pier;

Installation and testing of active ground anchor through a tubular steel pile to provide restraint on the Main Approach; and

Refurbishment of the Pedestrian Walkway including replacement of steel deck plates.

Location: Tiree

Contact: procurement@cmassets.co.uk

Publication Date: 28/02/2019