Construction leads - March 28th

MIXED USE and NON-RESIDENTIAL

Applicant: Blagden Property.

Planning Authority: Edinburgh  

Details: Conversion of existing language school to aparthotel. Removal of non-load bearing internal partitions (constructed in 1970’s). New internal fit out to provide 7  short term let apartments.

Location: Wallace College 12 George Iv Bridge Edinburgh

Agent: Neil Taylor Admiral House 29 - 30 Maritime Street Edinburgh

Reference: 23/01034/LBC

Application Link 

 

Applicant: The Roseate Edinburgh Ltd.

Planning Authority: Edinburgh   

Details: Change of use from flat to hotel annex, enlarge opening and fit new door and fan light, alter door and screen and fit new double doors.

Location: 3 West Coates Edinburgh  

Agent: McLaren Murdoch & Hamilton. FAO: Damian Smith 229 Balgreen Road Edinburgh

Reference: 23/00776/FUL

Application Link 

 

Applicant: Dragonglass UK Holding Limited. 

Planning Authority: Edinburgh  

Details: The proposal for the town house entrance is to demolish an existing porch and stone-tile floor finish. The intention is to construct a canopy that is more in-keeping with the original 1930s Grosvenor Hotel design.

Location: Hilton Grosvenor Club 20 - 24 Grosvenor Street Edinburgh

Agent: Fletcher Joseph Associates. FAO: Sonia Hughes 5 Millar Place Edinburgh

Reference: 22/05594/FUL

Application Link 

 

TENDERS

Contract Authority: University of St Andrews

Details: External building fabric repairs including stripping and re-slating pitched roofs to 5 South Street; replacing lead flashings; replacing rainwater goods to 3 and 5 South Street; replacing lintels and further stonework repairs to both properties; window works and further miscellaneous works.

Location: 3-5 South Street St Andrews

Contact: procurement@st-andrews.ac.uk

Publication Date: 27/03/2023

 

Contract Authority: SRUC Edinburgh

Details: SRUC recently commissioned an extensive review of the facilities at our Edinburgh Campus by space planning specialist the output from which was the Edinburgh Campus Master Plan and associated appendices.

The overall Master Plan has been divided into discrete projects with the Enabling Works Project being seen as the critical first step in the upgrading & modernisation of the campus.

The enabling works project focuses on creating a fully accessible and compliant campus by installing:

- two platform lifts to serve two sets of four lecture theatres

- modifications to an existing accessibility lift to allow access to all levels of the administration wing

- new fire escape stairways to comply with building evacuation distances and times; and

- create refuge areas as required.

Location: Peter Wilson Building, SRUC Edinburgh Campus,

Contact: procurement@sruc.ac.uk

Publication Date: 27/03/2023

Share icon
Share this article:

Related Articles