Construction leads - May 18th
MIXED USE and NON-RESIDENTIAL
Applicant: The Co-proprietors
Planning Authority: Glasgow
Details: Re-roofing and fabric repairs to flatted dwellings
Location: 4 Southpark Avenue/ 2 Bower Street Glasgow
Agent: Brunton Drawing Co Ltd Stuart Mackenzie 17 Westoe Path Glasgow
Reference: 23/00980/FUL
Application Link
Applicant: Baird Limited Co Dandara Living Developments Ltd
Planning Authority: Glasgow
Details: Construction of mixed-use development comprising residential flats (Sui generis) and student accommodation (Sui generis) including ancillary facilities and services, commercial units with Retail (Class 1A), Food and Drink (Class 3), Business (Class 4), Assembly and Leisure (Class 11), landscaping/public realm, access, car parking and associated works.
Location: Site Bounded By Cheapside Street/Piccadilly Street/Warroch Street/ Anderston Quay Glasgow
Agent: Porter Planning Ltd Per Teri Porter 39 St Vincent Street Glasgow
Reference: 23/00896/FUL
Application Link
RESIDENTIAL – FEWER THAN TEN UNITS
Applicant: New West Properties Ltd
Planning Authority: Glasgow
Details: Construction of flatted residential development (6 units) and associated works
Location: Site Adjacent To 127 Causewayside Street Glasgow
Agent: Design Practice Architects Per Philip McCulloch Flat 1/2 15 North Claremont Street Glasgow
Reference: 23/00935/FUL
Application Link
TENDERS
Contract Authority: Angus Housing Association Ltd
Details: Remove existing and replace with new kitchens, bathrooms, boilers, radiators, electric storage heaters, upgrading loft insulation to 49Nr properties
Location: Arbroath
Contact: admin@aha.org.uk
Publication Date: 17/05/2023
Contract Authority: The City of Edinburgh Council
Details: The City of Edinburgh Council (the Council) is seeking to procure the delivery of a low carbon heat network to serve the Granton Waterfront development and existing buildings in the surrounding area under a concession model. The Council wishes to identify a concessionaire with the most economically advantageous tender to design, build, finance, operate and maintain the low carbon heat network using a two-stage process.
The successful tenderer will initially be appointed to work with the Council over a c.8 month period under a Pre-Development contract before a final business case for the project is made.
Location: Heat Network Opportunity at Granton Waterfront, Edinburgh
Contact: kelly.faulds@edinburgh.gov.uk
Publication Date: 17/05/2023