Construction Leads - May 2nd

MIXED USE and NON-RESIDENTIAL

Applicant: Mr E Alison

Planning Authority: Dumfries 

Details: Construction Of Two Industrial Units



Location: Land Adjacent To 12 Howgate Street Dumfries

Agent: Neil Davies 23 Dalbeattie Road Dumfries

Reference: 19/0573/FUL

Application Link 



 

RESIDENTIAL – FEWER THAN TEN UNITS

Applicant: SFO Holdings Ltd

Planning Authority: South Ayrshire  



Details: Construction of 3 dwellinghouses 

Location: Land At Kirkoswald Road Turnberry  

Agent: Thomson Hunter Architects Ltd Grant Herron 21 Portland Road Kilmarnock

Reference: 19/00271/APP



Application Link 

 

Applicant:Mr Jay Crawford

Planning Authority: South Ayrshire

Details: Construction of 2 dwellinghouses  

Location: Dowhill Farm A77T From Girvan Road Turnberry To Vicarton Street Girvan North Of Girvan

Agent: CASA Design Architects Ltd Christopher Stewart The Studio 14A Beresford Terrace Ayr

Reference: 19/00341/APP

Application Link  

 

TENDERS

Contract Authority: Hadden Group

Details: Provision of M & E supply and installation

Location: Stirling

Contact: Martin Tawse 01764660011

Publication Date: 01/05/2019

 

Contract Authority: Moray Council

Details: This project is required to make the bridge deck waterproof and protect its critical structural elements. During this work a Principal Inspection will be undertaken to assess the condition of the bridge below the surfacing.

The work consists of the removing the existing Surfacing, Kerbing, Footway Concrete Infill, Mastic Waterproofing and replacing this with a Spray on Waterproofing System, New Kerbing and appropriate Surfacing.

Location: Glenlivet

Contact: procurerment@moray.gov.uk

Share icon
Share this article:

Related Articles