Construction leads - May 5th
MIXED USE and NON-RESIDENTIAL
Applicant: SLB
Planning Authority: Aberdeen
Details: Replacement of existing glazed aluminium frame corridor with timber frame structure and solar array to roof; replacement of existing cladding and glazing with installation of doors and windows and other associated works
Location: Schlumberger Oilfield Uk Plc Kirkton Avenue Aberdeen
Agent: Daniel Gray CPM 22 22 Rubislaw Terrace Aberdeen
Reference: 230486/DPP
Application Link
Applicant: Taylor & Martin On Behalf Of Property Owners
Planning Authority: Dundee
Details: External alterations to prevent further decay of historic building fabric.
Location: 28 - 32 Cowgate & 5 - 9 King Street Dundee
Agent: Ryan Watson James F Stephen Architects Milton Studio Glamis Forfar
Reference: 23/00229/FULL
Application Link
Applicant: Dundee United Football Club
Planning Authority: Dundee
Details: Proposed construction of spectator stand
Location: Gussie Park Tannadice Street Dundee
Agent: Andrew Black - Andrew Black Design The Mews 27 Tay Street Lane Dundee
Reference: 23/00215/FULL
Application Link
TENDERS
Contract Authority: Tollcross Housing Association Limited
Details: The works comprise the design, supply and installation of new gas central heating boilers and associated works to approximately 523Nr properties
Location: Glasgow
Contact: brian.trearty@tollcross-ha.
Publication Date: 03/05/2023
Contract Authority: National Records of Scotland
Details: The works will comprise a complete overhaul of the roof and drainage systems in order to restore and maintain the functionality of New Register House and fulfil NRS’ obligations as custodian of the A-listed building.
The main elements for the works contract include:
- - Flat roof – replacement of all membrane roofing and gutters with lead, potentially regrading of roof levels to achieve better falls, including gutter falls.
- - Rainwater drainage –100% replacement of existing gulleys and rainwater pipe fittings through the roof, adding in access points and inclusion of additional gulleys and drainage to improve design capacity and operation of discharge system.
- - Rooflights – full overhaul of all rooflights including replacement of glazing
- - Slate roofing – slate repairs or replacement, including ridge cappings and flashing repairs.
- - Chimney repairs – structural repairs to at least three of the chimneys and extensive stone repairs to the others.
- - Masonry repairs – masonry repairs are required to the perimeter walls
- - Internal finishes – repairs required as a result of previous water ingress and to allow replacement of the rainwater pipes.
- - Services – removal of redundant services and replacement of end of life M&E services on the roof, and associated systems and connections
- - Maintenance access – Introduction of an access gantry system that will double up as support for the services equipment.
Location: Edinburgh
Contact: leanne.gourlay@nrscotland.gov.
Publication Date: 03/05/2023