Construction leads - November 27th

MIXED USE and NON-RESIDENTIAL

Applicant: Royal Botanic Garden.

Planning Authority: Edinburgh

Details: Redevelopment and refurbishment of the North East corner of the Royal Botanic Garden. Development comprises works to listed buildings/structures. Construction of a glasshouse, research glasshouses, education and support buildings and landscape works. Construction of polytunnels/temporary decent facilities, construction of access road and associated development and demolition.



Location: Royal Botanic Garden, 20A Inverleith Row, Edinburgh

Agent: Ironside Farrar Ltd, Ed FAO: Albert Muckley, 111 McDonald Road, Edinburgh

Reference: 18/09704/PAN

Application Link 



 

Applicant: Northern Trust FAO: Mrs Helen Ashworth, Lynton House, Ackhurst Park, Foxhole Road, Chorley, Lancashire

Planning Authority: Edinburgh

Details: Construction of 4 business/industrial warehouses (classes 4, 5 and 6), car parking, landscaping, access and associated works.



Location: Land 147 metres southeast of 8 Cliftonhall Industrial Estate, Newbridge

Agent: None

Reference: 18/09462/FUL

Application Link 



 

RESIDENTIAL – FEWER THAN TEN UNITS

Applicant: Mr Terry McCormack 

Planning Authority: Edinburgh

Details: Alterations change of use and sub-division of existing double shop unit to form 2 residential units, 1 1-bedroom flat and 1 studio flat. Alter frontage to fit new windows and doors, alter window openings to rear to fit doors.

Location: 11 - 13 Restalrig Road, Edinburgh

Agent: Arctec Build Ltd. FAO: Andrew Dodds, 4 The Maltings, Haddington, East Lothian

Reference: 18/09683/FUL

Application Link 

 

TENDERS

Contract Authority: Perth & Kinross Council

Details: North Muirton Reservoir forms part of the Perth Flood Prevention Scheme (PFPS). In January 2016, on the only occasion when water levels in the River Tay have been high enough to bring the reservoir into operation, flooding was experienced in the Bute Drive area. Subsequent investigations have concluded that this flooding was due to seepage under the southern embankment. One element of this project is to install a seepage cut-off wall (sheet piles) to prevent a reoccurrence of this issue. An inspection also found that the outfall/headwall structure on the River Tay has been undermined and is in need of reconstruction. The second element of this project is to undertake this remedial and erosion protection work on the Headwall/outfall.

Location: Perth

Contact: rsstewart@pkc.gov.uk

Publication Date: 23/11/2018

 

Contract Authority: Scottish Autism

Details: The Replacement of Internal Doors to classrooms, etc., which require upgrading, specifically specified to assist supporting individuals with ASD (Autism Spectrum Disorder).

Location: Alloa

Contact: roy.aitken@scottishautism.org

Publication Date: 23/11/2018

Share icon
Share this article:

Related Articles