Construction leads - September 24th
MIXED USE and NON-RESIDENTIAL
Applicant: National Trust For Scotland.
Planning Authority: Edinburgh
Details: Ground floor proposals are: change existing shopfront from timber lined finish to glazed bi-fold door slightly forward from existing shopfront line. Cladding of existing internal column. Introduction of new accessible WC. Third floor: new fire rated partitions fitted between painted chamber + existing office to reinstate 3rd floor apartment. Minor penetrations to building fabric for ventilation.
Location: 483 Lawnmarket, Edinburgh
Agent: Gleeds Building Surveying Ltd. FAO: Gordon Ross 93 West George Street Glasgow
Reference: 19/04218/LBC
Application Link
Applicant: Lyle & Scott Ltd.
Planning Authority: Edinburgh
Details: The proposal is to update a current retail store offering to include a small cafe area, barber’s area, and a repair workshop within the store space.
Location: GF 63 George Street, Edinburgh
Agent: Office Twelve. Tanya Hardingham 1934 The Yard, 2 Exploration Drive, Pioneer Park, Leicester
Reference: 19/04195/FUL
Application Link
Applicant: Network Rail. FAO: Mrs Nicola Slaven 151 St Vincent Street Glasgow
Planning Authority: Edinburgh
Details: Development of a Forth Bridge Walk Reception Centre; new sections of bridge access system; new viewing platforms; associated car parking; landscaping; servicing and alterations to existing vehicular and pedestrian accesses.
Location: Forth Rail Bridge, Hawes Brae, South Queensferry
Agent: Applicant
Reference: 19/04116/FUL
Application Link
TENDERS
Contract Authority: Clyde Valley Housing Association Limited
Details: The project consists of all facade repair works required to replace the existing defective external wall render using the manufacturer’s specified materials. The works are to be completed to the CVG office building at the address of 50 Scott Street. Works shall generally include:
- Scaffolding;
- Safety barriers and other measures to protect ground floor public road/walkway and rear company car park/ employee vehicles;
- Stripping of defective render works;
- Application of new render in accordance to StoTherm specification;
- Disposal of corrupted material via skip
Location: Motherwell
Contact: mark.quigley@cvha.org.uk
Publication Date: 23/09/2019
Contract Authority: Scottish Police Authority
Details: Adaptations to first floor of the building to replace existing electrical distribution boards & wiring. Proposed works will also modify first floor layout, include various down takings, floor/wall/ceiling finishes & associated mechanical & electrical works.
The contract duration shall be for 10 weeks.
Location: Lanark Police Station, 27 Westport, Lanark,
Contact: Charlotte.Reid@scotland.pnn.police.uk
Publication Date: 23/09/2019