Construction leads - September 29th

MIXED USE and NON-RESIDENTIAL

Applicant: Cater Group Ltd

Planning Authority: Glasgow

Details: Construction of mixed-use development to vacant site, consisting 6 residential flatted dwellings with rear terraces over 2 retail units (Class 1), car parking, landscaping and access



Location: Site Between 1034 - 1046 Tollcross Road, Glasgow

Agent: Neil Rothnie Architecture, Per Ian Hislop, 73 Huntly Street, Aberdeen

Reference: 21/02845/FUL

Application Link 



 

RESIDENTIAL – FEWER THAN TEN UNITS

Applicant: Caygill Associates Ltd Graham Caygill Quarry Hills Ratten Row Alnwick

Planning Authority: Scottish Borders 



Details: Change of use from former builder store and alterations to form two dwellinghouses and associated work

Location: Builder Store And Land East Of 16 Albert Place, Kelso, Scottish Borders

Agent: Applicant

Reference: 21/01520/FUL



Application Link 

 

Applicant: PMD (Properties) Ltd

Planning Authority: Glasgow

Details: Construction of two mews dwellings and associated works

Location: Site To The Rear Of 11 And 12 Somerset Place, Glasgow 

Agent: Unit5 Architects Ltd

Reference: 21/02849/FUL

Application Link 

 

TENDERS

Contract Authority: North Lanarkshire Council

Details: North Lanarkshire Council intends to establish a multi supplier Framework Agreement for the provision of resurfacing / reconstruction and minor repair works to footways, footpaths and paved areas within the North Lanarkshire Council geographical boundary. The procurement is driven by the requirement to construct new and extend the life of the existing footway, footpath and paved area network, typically through the process of resurfacing, reconstruction and minor repair works. The requirement also includes the provision of ancillary items such as traffic management, drainage, kerbing etc. to be delivered with the works.

Location: North Lanarkshire

Contact: stewartpa@northlan.gov.uk

Publication Date: 28/09/2021

 

Contract Authority: North Ayrshire Council

Details: North Ayrshire Council requires a Tier 1 contractor to develop the design proposals from the end of RIBA Stage 3 and to build the new Ardrossan Community Campus. The appointed contractor will be expected to take the design provided from the Lead Designer/Architect and their teams and develop it to deliver the new campus. The contractor will also need to undertake the demolition of the existing Ardrossan Academy and Winton Primary Schools.

The campus is to be a highly energy efficient building designed to meet Passivhaus certification standards and will be required to meet challenging in-use energy requirements. The design team already appointed by the Council will be novated to the appointed Tier 1 contractor to maintain the integrity of the design.

This is a large and complex building with a range of uses and the Tier 1 contractor will need to be able to demonstrate that they have successfully built 2 educational and/or community or health care facilities etc. (over 40 million GBP in value) within the last 5 years.

Location: Arran

Contact: procurement@north-ayrshire.gov.uk

Publication Date: 28/09/2021

Share icon
Share this article:

Related Articles