Construction leads - September 30th
MIXED USE and NON-RESIDENTIAL
Applicant: Mr Allan Jamieson
Planning Authority: Edinburgh
Details: Convert the existing restaurant to a ground floor shop and the lower ground floor to flat. Open up existing in-filled windows and fit timber sash and case windows. Remove existing concrete stair, remove existing gate and reinstate railings, remove internal stair.
Location: 38 William Street, Edinburgh
Agent: In-Built Design, Fao Henry Allan. 30 Bruntsfield Gardens, Edinburgh
Reference: 19/04437/LBC
Application Link
Applicant: The Royal Bank Of Scotland Plc.
Planning Authority: Edinburgh
Details: Application to materially alter the interior of the Ground Floor, First Floor and Second Floor of the ‘South Block’ of 36 St. Andrew Sq. (NB. Reference to floor levels are based on ‘South Block’ entrance level, this differs from ‘Dundas House’ level entry). Works include: full internal downtakings (excl. stair cores), lift renewal, updated and new sanitary facilities and full building interior refurbishments to bring currently unused, ‘dated’ office space into modern, usable office space.
Location: 35 - 36 St Andrew Square, Edinburgh
Agent: Michael Laird Architects. FAO: Andrea Santoni, Michael Laird Architects, 5 Forres Street, Edinburgh
Reference: 19/04335/LBC
Application Link
RESIDENTIAL – FEWER THAN TEN UNITS
Applicant: Mr & Mrs A Nadeem.
Planning Authority: Edinburgh
Details: 2 new flats on plot adjacent to no 79.
Location: 79 Cleekim Drive, Edinburgh
Agent: Whitelaw Associates. FAO: Tom Whitelaw, Kitleybrig, Kitleyknowe, Carlops, Penicuik
Reference: 19/04333/FUL
Application Link
TENDERS
Contract Authority: Aberdeen City Council
Details: The works comprise the replacement of door entry systems to multi storey blocks along with associated minor builder’s work
Location: Aberdeen
Contact: cpscityshare@aberdeencity.gov.uk
Publication Date: 27/09/2019
Contract Authority: Scottish Prison Service
Details: Aim - Refurbishment upgrade of existing shower rooms within the Bruce & Wallace Wings at Castle Huntly.
Objective - Upgrade the four section shower facilities with a design that fully meets building regulations and reduces future repair and maintenance requirements.
Background - The existing shower facilities within the section areas of Bruce & Wallace Wings require upgrading to minimise future repair and maintenance costs. There are four shower areas to be refurbished, each consisting of two shower cubicles and one wash hand basin. Flooring is concrete with existing drainage and each shower cubicle raised on a timber plinth (minus one area within Bruce wing). The floor area of each facility measures approximately 7m squared.
Location: Castle Huntly
Contact: stuart.dodds@sps.pnn.gov.uk
Publication Date: 27/09/2019