Construction leads - September 9th
MIXED USE and NON-RESIDENTIAL
Applicant: Whirlwind Energy Storage Limited
Planning Authority:
Details: Construction and operation of a battery energy storage facility consisting of up to 50 containerised battery storage units, ancillary transformers and inverters, connection building, site office and store, fencing and landscaping
Location: Land 300M SE Of Househill House Househill Nairn
Agent: The Energy Workshop Per: Dan Grierson 32 Park Cross Street Leeds
Reference: 22/03638/FUL
Application Link
RESIDENTIAL – TEN UNITS OR MORE
Applicant: Tayside Property Management
Planning Authority: Dundee
Details: Alterations and conversion of existing building and construction of extension to create 10 flatted dwellings
Location: Roseangle Guest House 28 Roseangle Dundee
Agent: Jackie Stephen Brunton Design 95 Dundee Street Carnoustie Angus
Reference: 22/00515/FULL
Application Link
RESIDENTIAL – FEWER THAN TEN UNITS
Applicant: Glenmoir Construction Ltd
Planning Authority: Moray
Details: Redevelopment of existing buildings and proposed extension to form new build flats
Location: 30 - 32 Mid Street Keith Moray
Agent: John Wink Design Midtown Of Foudland Glens Of Foudland Huntly Aberdeenshire
Reference: 22/01228/APP
Application Link
TENDERS
Contract Authority: Friends of Tarlair Community Group
Details: The works comprise the restoration of the central Category A listed pavilion located at Tarlair swimming pool.
Including the demolition and replacement of a single storey extension. Replacing with a new modern single storey extension with concrete slabs, timber framed marble clad walls, aluminum windows and timber flat roof with waterproof coatings.
Internal works to the main pavilion include a full internal strip out back to concrete walls, including all redundant services, removal and replacement of the existing concrete floors, timber floor and wall panel restoration works, concrete repair works to walls, columns, beams and soffits, new roof coverings, opening previously filled openings and replacing with steel windows, cills and hardwood doors all in keeping with the original Art Deco design. New kitchen, WC’s, ceramic floor and wall tiles, hardwood flooring, cork insulated internal walls with lime plaster finish, new M&E services.
Externally the works include new surface and foul drainage including the installation of a treatment tank, concrete repairs to walls, soffits, columns and beams, full redecoration, restoration and replacement works to the existing balustrades and handrails, installation of new water and electric utilities to the site from shore road including connections.
Location: Gardenstown
Contact: patwain51@hotmail.co.uk
Publication Date:06/09/2022
Contract Authority: Scottish Environment Protection Agency
Details: SEPA has established a network of high volume air samplers (HVAS) across Scotland both around the nuclear licensed sites and remote from nuclear sites.
SEPA is seeking to establish a contract with suitably qualified, skilled and experienced organisation to undertake management and maintenance of the high volume air monitoring network.
Location: National
Contact: supplier.communications@sepa.
Publication Date: 06/09/2022