Construction leads and tenders - March 8th

MIXED USE and NON-RESIDENTIAL

Applicant: Whitbread PLC

Planning Authority: Glasgow

Details: Construction of extension to hotel comprising 54 bedrooms and Class 3 coffee shop with associated external seating at ground floor and reduction of car parking.



Location: Premier Inn, 30 Pacific Quay, Glasgow

Agent: LMA Architects, The Atrium, 6 New Road, Ayr

 

Applicant: Nursery Rhymes Nurseries Ltd



Planning Authority: Glasgow

Details: Construction of student accommodation and associated works.

Location: Site at junction of Sandyford Street/ Kelvinhaugh Street, Glasgow

Agent: Young and Gault, John Gault, Merlin House, Mossland Road, Glasgow



 

RESIDENTIAL – FEWER THAN TEN UNITS

Applicant: Mr W.G Buchan

Planning Authority: Perth



Details: Residential development (in principle)

Location: Former W M Buchan, Perth Road Garage, 33 Perth Road, Stanley, Perth

Agent: Mark Williamson,34 Hermitage Drive, Perth

 

TENDERS

Contract Authority: National Galleries of Scotland

Details: To remove the existing set of sliding doors in the meeting room of the Bridge Lodge.

To manufacture a new set of European oak hardwood doors and fit into the existing door aperture.

Supply and fit of all ironmongery to match that of the existing sliding doors.

Make good rotten bottom rail in adjacent glazed side panel.

Location: Edinburgh

Contact: bdarling@nationalgalleries.org

Publication Date: 07/03/2018

 

Contract Authority: Comhairle nan Eilean Siar

Details: Creed bridge was built on a river crossing on an unclassified section of the Pentland Moor Road.

The existing bridge deck consists of 4 No steel beams spanning a distance of 6.25m simply supported on masonry abutments. There is a very slight skew on the span which can be absorbed by the deck construction. Total deck width is 4.4m wide comprising 3.3m road and 0.4-0.5m undefined verges. The existing parapet is sub-standard post and rail with end pillars. Deck consists of a 150mm concrete slab on jack arches spanning transverse to the longitudinal span. Existing deck is friable and steel rebar is exposed.

The existing deck has large areas to the underside exhibiting spalling and exposed reinforcement. The type of concrete used for the deck is marine sourced aggregate and is made up of 20-30mm rounded stone with isolated small stones.

Location: Stornoway

Contact: contracts@cne-siar.gov.uk

Publication Date 07/03/2018

Share icon
Share this article:

Related Articles