Guidance for the construction industry has been updated following the move into Phase 2 of Scotland’s route map out of lockdown and the next phase of the industry’s restart plan.

Construction sector guidance updated as work in ‘non essential’ sectors continues to build

With the sector this week moving into Phase 3 of the six-step phased model from Construction Scotland, which allows for ‘steady state operation’ where physical distancing can be maintained, the existing guidance has been updated to reflect the change.

Work on construction in the following ‘non essential’ sectors can continue to build up in line with all relevant health and safety legislation, public health guidance, and the industry’s Site Operating Guidelines:



  • domestic housing
  • schools, further and higher education institutions and early years provision
  • office buildings and other commercial properties
  • leisure
  • retail
  • warehousing
  • garages and showrooms
  • ecclesiastical
  • community centres
  • non-health related civic buildings
  • public realm - hard and soft including (but not limited to) roads, which includes footpaths, footways, cycle lanes and verges; pavements; parks; and grassy areas
  • justice and custodial

Where works cannot proceed operations should be shut down safely and securely, ensuring that partially-built structures are safe, and if necessary wind- and water-tight, associated equipment is properly stored, and sites have suitable security for the duration.

Companies should maintain suitable arrangements for monitoring site security and safety, and personnel may be allowed on-site to carry out essential remedial work in line with existing contracts, or in the light of urgent work emerging.