Ogilvie begins construction of Finnieston apartments
Ogilvie Construction has started site operations to build more than 100 apartments in Glasgow’s West End for Drum Property Group.
About this development:
- Authority:Glasgow City
- Type:Residential
- Applications:
- Team:Drum Property Group (developer), Darnton B3 Architects (architect)
When complete, G3 Square in Minerva Street will feature 108 apartments and penthouses within a landscaped outdoor space. The development, which was unveiled earlier this year, will rise to six stories, with car parking and lift access to all levels.
The architecture has been designed to echo the height and feel of nearby traditional sandstone buildings and crescents, while planting will frame around both sides of the south block and flow through the centre, creating leafy spaces for recreation and a place for residents to relax in the heart of the city.
Due for completion in 2020, apartments will range in size from one, two and three bedrooms.
Donald MacDonald, managing director, Ogilvie Construction, said: “It is great to see building work now started on site and we look forward to completing a unique development that will enhance residential living in Glasgow’s West End. G3 Square will be constructed to the highest quality standards using modern, sustainable materials. Our site team will ensure minimum disruption in the immediate area during construction, engaging with the community throughout.”
Fife Hyland, communications director at Drum Property Group, said: “G3 Square represents the perfect combination of stylish properties in a highly sought-after location. We have been greatly encouraged with the level of enquiries and reservations to date and with construction now under way expect that demand to continue to increase over the coming months.”