Search:

9106-9120 of 37003 Articles
Clock icon 1 minute

Ground Developments Ltd has been awarded the enabling works package by Standardkessel Baumgarte for the new Baldovie Energy from Waste Combined Heat and Power Facility in Dundee. The facility will generate electricity as well as steam for the local industry in a highly efficient process.

Clock icon 7 minutes

Electric vehicle charging points launched at Maxim Office Park Maxim Office Park has announced the addition of electric vehicle (EV) charging points at the Park, the first available along the M8 between Glasgow and Edinburgh.

Clock icon 1 minute

A number of construction sites across the UK have ground to a halt due to heavy snow, according to the Federation of Master Builders (FMB). As the 'Beast from the East' brings snow and storms to the UK, the trade body warned that the freezing temperatures mean it’s too cold to lay bricks.

9106-9120 of 37003 Articles