Aecc/Teca

1-15 of 22 Articles
Clock icon 3 minutes

Around £75 million has been wiped off the value of The Events Complex Aberdeen (TECA), by KPMG's audit of Aberdeen City Council's books. The Big Four firm has revealed that the exhibition centre, which includes the P&J Live arena, two hotels and an energy centre, is now worth around 80% of

Clock icon 3 minutes

Henry Boot Developments (HBD) and Robertson have completed work on The Event Complex Aberdeen (TECA) – which is the largest new entertainment complex in Europe and the largest ever project for both firms. The world-class complex, which includes the P&J Live arena and two on-site hotels, of

Clock icon 3 minutes

New computer-generated visualisations have been released of The Event Complex Aberdeen (TECA) as the multi-million pound venue enters its final phase of construction. The new images, which have been created by the venue’s architect Keppie Design, show the exhibition hall, hospit

Clock icon 3 minutes

The development of The Event Complex Aberdeen (TECA) has reached another major milestone, as the energy centre that will provide the facility with clean, sustainable, and reliable energy goes live. The multi-million-pound venue, which is being delivered by Aberdeen City Council and its development p

Clock icon 4 minutes

Scottish facilities management firm FES FM has been appointed to operate the energy centre for The Event Complex Aberdeen (TECA) and two on-site hotels, which will showcase renewable technologies contributing to the city’s position as the energy capital of Europe. The company, which has an off

Clock icon 3 minutes

An Austrian-based specialist has been appointed to build an anaerobic digestion gas to grid plant at The Event Complex Aberdeen (TECA). The plant will take the city’s food waste, agricultural crops, and waste products to produce biogas to power the multi-million-pound new TECA arena, conferenc

Clock icon 3 minutes

Partners involved in building the new multi-million-pound The Event Complex Aberdeen (TECA) have unveiled an opening date for the venue of summer 2019. TECA arena, conference centre and exhibition building is part of the new AECC project which includes two on-site hotels, an energy centre, extensive

Clock icon 2 minutes

A painter who was placed into an induced coma following a fall at the new Aberdeen Exhibition Centre (AECC) construction site has died from his injuries. Kevin Stewart, from the Ellon area, was preparing a room in a hotel for painting on Tuesday September 4 when he sustained “serious head injuries

Clock icon 3 minutes

The 150-bedroom Aloft Hotel, part of the new AECC project which includes The Event Complex Aberdeen (TECA), has “topped out” now that the structure has been completed. The hotel, located just north of the Hilton Hotel that adjoins TECA, will be the first building in Phase 2 of the AECC masterpla

Clock icon 2 minutes

Student Ryan Bowie receives his work placement certificate from AECC senior site manager Gerry Goldie Robertson Group is tackling the issue of labour shortages in the construction sector by actively encouraging work experience placements at the new Aberdeen Exhibition and Conference Centre (AECC).

Clock icon 2 minutes

The company charged with cladding work on the new £333 million Aberdeen Exhibition and Conference Centre (AECC) has gone into administration, though Robertson Group has ensured that the project will finish on time. The Evening Express has reported that Leeds-based Cover Structure was placed into ad

Clock icon 2 minutes

Construction has commenced on a 150-bedroom hotel on the site of the new Aberdeen Exhibition and Conference Centre (AECC). The Aloft Hotel will be the first building in phase 2 of the AECC masterplan at Bucksburn, and will be located just north of the Hilton Hotel that adjoins the new AECC, which is

1-15 of 22 Articles
Intership icon

Latest Jobs

Intership icon

Latest Events