The Secretary of State for Scotland, Rt Hon Ian Murray MP, toured Scotland’s first purpose-built offshore wind marshalling facility at the Port of Dundee. The Port of Dundee’s renewables hub became fully operational in 2022, following a private investment of £40 million by Forth Po
Forth Ports
Forth Ports is moving forward with phase two of Harbour 31, known as The Dry Dock at Harbour 31, a new creative and commercial hub on land to the east of Edinburgh Dock within the Port of Leith.
The Category A-listed Victoria Swing Bridge located at the Port of Leith was officially reopened at the weekend following a full refurbishment by Forth Ports. The six-figure investment saw a programme of specialist works to refurbish the 150-year-old bridge, which is the largest counterweighted swin
Forth Ports has submitted an application for Planning Permission in Principle for a new housing, commercial and retail development on a 4.7-acre waterfront site at the Port of Leith.
The secretary of state for Scotland Alister Jack MP toured the nation’s largest renewables hub at the Port of Leith last week as the new riverside berth reaches a significant construction milestone.
Onshore wind turbine crane and installation services provider Global Wind Projects has commenced work on what is its first offshore wind project. The company, which was created in April 2021 by Global Port Services - part of the Inverness and Aberdeen-based energy sector service group, Global Energy
The most pivotal milestone yet in the development of the Neart na Gaoithe (NnG) offshore wind farm has been reached with the installation of its first wind turbine at sea.
Scotland’s biggest port operator Forth Ports has outlined a commitment for its operations to be carbon neutral by 2032 and net zero by 2042.
The consortium behind the bid for a Forth Green Freeport have today unveiled their transformative vision for the port, shipbuilding, manufacturing and logistics cluster at Rosyth. Babcock International, Forth Ports Group and Scarborough Muir Group plan to deliver a new freight terminal, offshore ren
Inch Cape Offshore Limited has selected the Port of Dundee as the pre-assembly and marshalling site for the construction of the 1.1GW Inch Cape Offshore Wind Farm. The agreement will see turbine blades, towers and nacelles, which house the turbine generators, being delivered to and pre-assembled at
Forth Ports has submitted a Proposal of Application Notice (PAN) to the City of Edinburgh Council for a mixed-use development on a 10-acre waterfront site at Leith. Named Harbour 31, the development has the aspiration to create a vibrant new neighbourhood for Leith including 700-800 residential
An investigation is to be carried out after demolition work at a Fife port caused part of a crane to fall into a dock yard. The topside element of the redundant crane – a legacy of the BiFab yard at Burntisland – crashed into the water yesterday morning.
The Western Harbour housing development in Leith has taken a significant step forward with the news that CCG Group has committed to developing the first phase of a 938-home development. A total of 118 homes for private sale are set to be delivered with construction starting in summer 2022 and comple
Forth Ports has applied for listed building consent to refurbish Rennie’s Isle Bridge in Leith. The company has teamed up with Teuchters Landing to submit plans to the City of Edinburgh Council for the refurbishment of the Category A-listed crossing located at the Water of Leith to conser
Forth Ports has been granted Listed Building Consent by the City of Edinburgh Council to fully repair the Category A Listed Victoria Swing Bridge located at the Port of Leith to conserve the bridge for the future and create a useable space for the local community. The private six-figure investment w