A painter who was placed into an induced coma following a fall at the new Aberdeen Exhibition Centre (AECC) construction site has died from his injuries. Kevin Stewart, from the Ellon area, was preparing a room in a hotel for painting on Tuesday September 4 when he sustained “serious head injuries
Henry Boot
The 150-bedroom Aloft Hotel, part of the new AECC project which includes The Event Complex Aberdeen (TECA), has “topped out” now that the structure has been completed. The hotel, located just north of the Hilton Hotel that adjoins TECA, will be the first building in Phase 2 of the AECC masterpla
Jamie Boot Henry Boot Construction has reported a 40% rise in profits in its results for the year ended 31 December 2017.
View of the Falkirk Gateway looking north over the site Contractors have been lined up to deliver £67 million of infrastructure investment works throughout Falkirk over the next six years, the local authority has said.
Construction has commenced on a 150-bedroom hotel on the site of the new Aberdeen Exhibition and Conference Centre (AECC). The Aloft Hotel will be the first building in phase 2 of the AECC masterplan at Bucksburn, and will be located just north of the Hilton Hotel that adjoins the new AECC, which is
Havelock Europa has been awarded a fit-out contract for the Hilton Resort and Spa currently being built by Robertson Group as part of its contract to deliver the new Aberdeen Exhibition and Conference Centre (AECC). The contract will see Havelock fit out all areas of the hotel, including front-of-ho
How the completed AECC will look Property and construction firm Henry Boot has credited its Scottish operations for contributing to a 9% jump in profits.
(from left) Andy Mallice (managing director, Robertson Construction Group) and Joe McMenamin (project director, AECC, Robertson Construction Group) receive Ultra Site certificate from Considerate Constructors Scheme chief executive Edward Hardy The construction of the Aberdeen Exhibition & Confe
Plans for the new Aberdeen Exhibition and Conference Centre Property and construction group Henry Boot has shrugged off concerns surrounding the EU referendum result with a surge in profits and turnover.
A key site in the centre of Clydebank looks set to be transformed after West Dunbartonshire Council approved plans to sell the plot to a major developer. The Play Drome and surrounding land in Abbotsford Road will be redeveloped for retail and leisure uses with a new town square and pocket park crea
Aberdeen Exhibition & Conference Centre contractor Henry Boot Developments said it is entering this year’s final quarter in a strong position with a number of high profile projects hitting significant milestones and half year results ahead of expectations. Based in Sheffield, and with offices
Aberdeen City Council and Hilton have signed a franchise licence agreement to open a 200 room Hilton Hotels & Resorts property at the new Aberdeen Exhibition & Conference Centre (AECC). Hilton Aberdeen Exhibition & Conference Centre, set to be the fourth Hilton property in the city, will
Jamie Boot Henry Boot has become the latest construction company to announce an increase in profits in the wake of industry-wide post-Brexit concerns.
Proposed masterplans for the new and current Aberdeen Exhibition and Conference Centre (AECC) sites are to go out for public feedback after they were backed by councillors. Proposals for the new 10,000-seater AECC arena at Rowett North in Bucksburn, which would include an energy centre and three hot
Architectural practice Keppie Design has been appointed as architect for the new state-of-the-art Aberdeen Exhibition and Conference Centre (AECC). Aberdeen City Council has recently approved the financial proposals for the development of the new AECC as well as the redevelopment of the site of the