Mackintosh Building

1-15 of 31 Articles
Clock icon 5 minutes

A lord ordinary has dismissed part of an action raised by the tenant of a building located next door to the fire-damaged Glasgow School of Art insofar as it related to assignees of the tenant but allowed the tenant’s part of the action to continue. Tecjet Ltd, part of a group of companies owne

Clock icon 2 minutes

As controversy rages over the reinstatement of Charles Rennie Mackintosh's Glasgow School of Art, this timely and thoroughly researched book makes an eloquent plea for the restoration of what was a jewel in Scotland's artistic and cultural crown. The Mack was considered to be the great masterpiece o

Clock icon 2 minutes

The recovery of the Glasgow School of Art’s (GSA) world-famous Mackintosh Building has reached another notable stage, with the installation of a protective white membrane “wrap” and completion of a temporary roof structure.

Clock icon 7 minutes

The Scottish Fire and Rescue Service (SFRS) has been unable to determine the cause of the fire at The Glasgow School of Art’s Mackintosh building in 2018, a three-year investigation has concluded. Much of the world-renowned building, designed by Charles Rennie Mackintosh, was extensively

Clock icon 4 minutes

A detailed analysis of future options for the fire-hit Mackintosh Building at the Glasgow School of Art (GSA) has concluded that a faithful reinstatement within the practical constraints of the regulatory environment is the preferred option for the facility.

Clock icon 5 minutes

The circumstances surrounding the two fires at the Glasgow School of Art’s Mackintosh Building should be the subject of a public inquiry with judicial powers, a Holyrood committee report has found. An inquiry into the incidents by MSPs on the culture, tourism, Europe and external affairs

Clock icon 1 minute

The O2 ABC in Glasgow which sustained substantial damage in the Glasgow School of Art fire last year is set to be demolished under new plans. The popular nightclub, music venue and former cinema on Sauchiehall Street was ravaged by a fire that tore through part of the Glasgow School of Art last June

Clock icon 2 minutes

Workers take advantage of a gap in the weather to continue work on the west gable of the Mackintosh Building Work to complete the stabilisation of the west gable of the Mackintosh Building has been delayed due to the recent bad weather.

Clock icon 4 minutes

Russell Wardrop Following the news that the Glasgow School of Art is choosing to rebuild the fire-struck Mackintosh Building, architect Russell Wardrop thinks the project should instead be used as a great opportunity to rebuild Sauchiehall Street.

1-15 of 31 Articles
Intership icon

Latest Events